Order of plastic injection chair molds processing flow chart
Step 1. Samples/drawing & requirements from you.
Step 2. The sheet will be copied to our design department, tooling department to do the structure and feasibility analysis.
Step 3. Before start mould design, the tooling schedule and processing sheet were done.
Step 4. Mould design:at the same time we will communicate & exchange the opinions with you.
Step 5. Material purchase:steel cutting and mould base tooling.
Step 6. Inspection of mould:our processing manager are following and controlling the tooling processing.
Step 7. Mould testing:we will inform you the date, then will send you the samples inspection report & injection parameters with the sample to you.
Step 8. Ready to ship out.

 